• $
  • €
  • ₽
  • ₺
  • £

TAP due to start excavation phase to connect two sections

TAP due to start excavation phase to connect two sections
18.01.2019 11:07
TAP AG, the consortium for construction of the Trans Adriatic Pipeline (TAP), will soon start excavation phase that will allow connecting the part of the gas pipeline that arrives by sea from Albania with the short stretch on land in Italy, Trend reports citing a message from the consortium.

The final part of this connection, about 1.5 kilometers long, will be realized using the micro-tunnel technology, said the message.

"The excavation will be carried out at 16 meters below the beach and therefore there will be no interference with what is happening on the surface, nor will there be any limitation of access to those areas for citizens,” the consortium said.

TAP project, worth 4.5 billion euros, is one of the priority energy projects for the European Union (EU). The project envisages transportation of gas from Azerbaijan's Shah Deniz Stage 2 to the EU countries.

Connecting with the Trans Anatolian Pipeline (TANAP) at the Greek-Turkish border, TAP will cross Northern Greece, Albania, and the Adriatic Sea before coming ashore in Southern Italy to connect to the Italian natural gas network.

The project is currently in its construction phase, which started in 2016.

Once built, TAP will offer a direct and cost-effective transportation route opening up the vital Southern Gas Corridor, a 3,500-kilometer long gas value chain stretching from the Caspian Sea to Europe.

TAP shareholders include BP (20 percent), SOCAR (20 percent), Snam S.p.A. (20 percent), Fluxys (19 percent), Enagás (16 percent) and Axpo (5 percent).



www.anews.az
Telegram
Go
Similar news
Similar news
Azerbaijan Holds Talks on Digitizing Pension and Benefit Payments for Citizens Living Abroad
Business 15:00
Azerbaijan Holds Talks on Digitizing Pension and Benefit Payments for Citizens Living Abroad
Preparatory Work Underway  to Apply New Technology for "Karabakh" Field Development
Business 14:00
Preparatory Work Underway to Apply New Technology for "Karabakh" Field Development
Azerbaijan flags over 3,200 structures in Caspian coast survey
Business 12:30
Azerbaijan flags over 3,200 structures in Caspian coast survey
Brent crude rises to $92.12 per barrel while WTI slips to $83.12
Business 10:30
Brent crude rises to $92.12 per barrel while WTI slips to $83.12
Gold prices dip to $3,726.6 per ounce on COMEX as silver edges up to $45.12
Business 09:59
Gold prices dip to $3,726.6 per ounce on COMEX as silver edges up to $45.12
Azerbaijan to complete railway to Armenian border in early 2027
Business 17:00
Azerbaijan to complete railway to Armenian border in early 2027
Azeri Light crude price rises to $98.79 per barrel
Business 15:30
Azeri Light crude price rises to $98.79 per barrel
Birbank Private named Azerbaijan’s Best Private Bank by PWM and The Banker
Business 14:30
Birbank Private named Azerbaijan’s Best Private Bank by PWM and The Banker
The Central Bank set the official exchange rate for the U.S. dollar at 1.7000 manats
Business 14:30
The Central Bank set the official exchange rate for the U.S. dollar at 1.7000 manats
Anews TV

Our official Youtube channel

Subscribe