• $
  • €
  • ₽
  • ₺
  • £

SOCAR talks progress of Baku Oil Refinery's modernization

SOCAR talks progress of Baku Oil Refinery's modernization
29.05.2020 00:14
The 2nd and 3rd stages of the modernization project of the Baku Oil Refinery named after Heydar Aliyev are currently being implemented in parallel, the Azerbaijani state-owned company SOCAR told Trend.

It was noted that the new bitumen plant was commissioned during the 1st stage of the project and is already fully functional.

The unit produces bitumen in volumes corresponding to the demand in the domestic market.

At present, modernization work is being carried out at the Baku Oil Refinery named after Heydar Aliyev, set to be completed by 2021. After modernization, the refinery’s production capacity will be increased from 6 million tons to 8 million tons annually, and the operating life of the enterprise will be prolonged till 2040.

The current oil refining unit (ELOU AVT) at the refinery was built in 1976.

The cost of modernization of the refinery is estimated at around $2.2 billion.

www.anews.az
Telegram
Go
Similar news
Similar news
Azerbaijan to include deep-lying ACG gas output in energy balance from 2027
Business 16:01
Azerbaijan to include deep-lying ACG gas output in energy balance from 2027
Tanker Khankendi makes historic first entry into Australian waters under Azerbaijani flag
Business 15:37
Tanker Khankendi makes historic first entry into Australian waters under Azerbaijani flag
SOCAR expects to disclose ACG recoverable gas volumes soon
Business 15:00
SOCAR expects to disclose ACG recoverable gas volumes soon
SOCAR, BP see ACG’s ultimate oil recovery factor above 40%
Business 14:30
SOCAR, BP see ACG’s ultimate oil recovery factor above 40%
BP says ACG annual oil output decline slows to 3%
Business 13:58
BP says ACG annual oil output decline slows to 3%
Azerbaijan central bank sets official exchange rates for November 13
Business 13:00
Azerbaijan central bank sets official exchange rates for November 13
Gold prices rise 0.7% to $3,912.4 per ounce on COMEX
Business 12:30
Gold prices rise 0.7% to $3,912.4 per ounce on COMEX
Azerbaijan gas pipeline to Europe operating at full capacity, Aliyev says
Business 12:29
Azerbaijan gas pipeline to Europe operating at full capacity, Aliyev says
Oil prices edge lower on easing geopolitical tension hopes and rising US stocks
Business 12:00
Oil prices edge lower on easing geopolitical tension hopes and rising US stocks
Anews TV

Our official Youtube channel

Subscribe