• $
  • €
  • ₽
  • ₺
  • £

TAP project 88.8% completed as of late July

TAP project 88.8% completed as of late July
16.08.2019 21:30

At the end of July 2019, the Trans Adriatic Pipeline (TAP) project was 88.8 percent completed, Trend reports citing the updated data published on the website of TAP AG consortium.

"TAP is currently moving further into the project construction phase. Every day hundreds of meters of TAP’s Right of Way (ROW) are cleared, strung, welded, lowered into the trenches and backfilled, in line with the project construction steps and schedule,” reads the message.

The completeness percentage includes all engineering and procurement scope as well as the progress on the 12 pipeline construction steps onshore, the construction of above ground installations (block valve stations, compressor stations and pipeline receiving terminal) as well as offshore construction and pipeline installation.

TAP project, worth 4.5 billion euros, is one of the priority energy projects for the European Union (EU). The project envisages transportation of gas from Azerbaijan's Shah Deniz Stage 2 to the EU countries.

Connecting with the Trans Anatolian Pipeline (TANAP) at the Greek-Turkish border, TAP will cross Northern Greece, Albania and the Adriatic Sea before coming ashore in Southern Italy to connect to the Italian natural gas network.

The project is currently in its construction phase, which started in 2016.

Once built, TAP will offer a direct and cost-effective transportation route opening up the vital Southern Gas Corridor, a 3,500-kilometer long gas value chain stretching from the Caspian Sea to Europe.

TAP shareholders include BP (20 percent), SOCAR (20 percent), Snam S.p.A. (20 percent), Fluxys (19 percent), Enagás (16 percent) and Axpo (5 percent).


www.anews.az
Twitter
Go
Similar news
Similar news
Azerbaijan to include deep-lying ACG gas output in energy balance from 2027
Business 16:01
Azerbaijan to include deep-lying ACG gas output in energy balance from 2027
Tanker Khankendi makes historic first entry into Australian waters under Azerbaijani flag
Business 15:37
Tanker Khankendi makes historic first entry into Australian waters under Azerbaijani flag
SOCAR expects to disclose ACG recoverable gas volumes soon
Business 15:00
SOCAR expects to disclose ACG recoverable gas volumes soon
SOCAR, BP see ACG’s ultimate oil recovery factor above 40%
Business 14:30
SOCAR, BP see ACG’s ultimate oil recovery factor above 40%
BP says ACG annual oil output decline slows to 3%
Business 13:58
BP says ACG annual oil output decline slows to 3%
Azerbaijan central bank sets official exchange rates for November 13
Business 13:00
Azerbaijan central bank sets official exchange rates for November 13
Gold prices rise 0.7% to $3,912.4 per ounce on COMEX
Business 12:30
Gold prices rise 0.7% to $3,912.4 per ounce on COMEX
Azerbaijan gas pipeline to Europe operating at full capacity, Aliyev says
Business 12:29
Azerbaijan gas pipeline to Europe operating at full capacity, Aliyev says
Oil prices edge lower on easing geopolitical tension hopes and rising US stocks
Business 12:00
Oil prices edge lower on easing geopolitical tension hopes and rising US stocks
Anews TV

Our official Youtube channel

Subscribe